How It Works

From first call to generating — 8 clear steps

The process from your first enquiry to a generating solar, battery or heat pump system in Dundee typically takes three to eight weeks. It covers eight clear steps: a no-obligation home survey, system design, grid notification to SSEN North, professional installation through our MCS-certified partners, and commissioning with a full handover.

Solar panel installation process for a Dundee home
  • 1

    Step 1: Initial enquiry

    Day 1

    Call us on 0141 230 0198, fill in the online form, or book a free home survey. We'll have an initial conversation about what you're looking for — solar, battery, heat pump, or a combination. No pressure, no deposit.

  • 2

    Step 2: On-site home survey

    Within 1–2 weeks

    A surveyor from our installation partner, Scot Energy Efficiency Ltd, visits your property. They assess roof orientation, shading, electrical infrastructure, insulation levels (for heat pumps), and take measurements. This is a technical visit — not a sales appointment.

  • 3

    Step 3: System design & exact pricing

    3–5 working days after survey

    Your surveyor designs the system to MCS MIS 3002 (solar) or MIS 3005 (heat pump) standards. You receive a detailed proposal with exact pricing, predicted yield or CoP, and a breakdown of what's included.

  • 4

    Step 4: DNO grid notification

    Submitted at acceptance

    Dundee is covered by SSEN North (Scottish and Southern Electricity Networks). Systems up to 3.68 kW per phase are notified under G98 — this is a simple form and rarely causes delays. Systems above that threshold require a G99 application, which can take 4–8 weeks for approval. Our installer handles all DNO paperwork as part of your quote.

  • 5

    Step 5: Building warrant (if required)

    If applicable — 4–6 weeks

    Most domestic solar installations don't need a building warrant. However, structural alterations, listed buildings, conservation areas, or heat pump installations involving significant plumbing changes may require one. If needed, applications are submitted through eBuildingStandards and we coordinate the process for you.

  • 6

    Step 6: Professional installation

    1–3 days on site

    All work is carried out by our MCS-certified installer partners (MCS, TrustMark, Gas Safe registered). A typical solar installation takes 1–2 days; solar plus battery takes 2 days; a heat pump installation takes 2–3 days. You'll know the exact schedule in advance and your project coordinator keeps you updated throughout.

  • 7

    Step 7: Commissioning & MCS handover

    Same day as completion

    Once installed, the system is tested, commissioned, and registered on the MCS database. You receive your MCS certificate — essential for Smart Export Guarantee registration. We register you for SEG export payments and set up your monitoring app so you can track generation from day one.

  • 8

    Step 8: Ongoing aftercare & monitoring

    Ongoing

    Your workmanship guarantee is backed by our MCS-certified installer partners and backed by manufacturer and workmanship warranties. If anything needs attention, you call us — we coordinate with the installer. Panels need minimal maintenance (no moving parts), but we recommend an annual visual check and monitoring review to catch any issues early.

  • Solar panel installation process for a Dundee home

    Total Timeline

    How long does the whole process take?

    Typically 4–8 weeks from survey to switch-on. The main variable is DNO approval for larger systems — we keep you updated at every stage.

    The main variable is DNO approval for larger systems (G99). We keep you updated at every stage and never ask for payment until installation is confirmed. Interest-free credit up to £30,000, subject to status.

    Frequently Asked Questions

    Common questions about working with us

    Do you install in Dundee?
    Yes. We cover Dundee and the surrounding DD postcodes with local home surveys. We install through MCS-certified partners, so your installation is carried out by an MCS-certified installer and registered on the MCS database.
    Can I add a battery to my existing solar panels?
    Yes — retrofit batteries are common. If your existing inverter is a hybrid model we can add storage directly. If it is a standard string inverter, we add an AC-coupled battery with its own inverter. Both approaches work well and will be confirmed at survey.
    Is finance available?
    Interest-free credit up to £30,000, subject to status.
    How do I get a quote?
    Call us or fill in the online form. We arrange a no-obligation on-site survey, then send you a written no-obligation quote with exact pricing and a full breakdown of what is included.

    We install through MCS-certified partners (MCS, TrustMark, Gas Safe registered).

    Last updated: 1 November 2026

    Start saving today

    Ready to go solar in Dundee?

    No-obligation consultation. Honest advice. No deposit. Book a free home survey or call.

    Installed through our MCS-certified partnersInterest-free credit up to £30,000, subject to statusCovers all of Scotland

    We install through MCS-certified partners. Learn about our partnership model.